Project Details
📍 Location: 23 Minilya Street, Innaloo WA 6018
📅 Construction Timeline: January 2025 – July 2026
🏗 Builder: Converge Design & Construct (Visit Website)
📖 Description:
The 23 Minilya Project is a residential development featuring a modern, low-rise build-to-rent apartment complex designed for sustainable living. It is a 2-storey apartment complex consisting of 7 units, with the look-and-feel of a townhouse complex. It is walking distance from the new City of Stirling CBD, which includes the Stirling train station and the Innaloo Shopping Centre. The site backs onto a large park and is within a 5km radius from Scarborough Beach and within a 10km radius from the Perth CBD.
Key Entities
- Developer and Owner: JBEM Pty Ltd (JBEM)
- Designer and Builder: Converge, Design and Construct (https://convergeconstruct.com/)
- Council: City of Stirling (City of Stirling – Welcome to the City of Stirling | view latest updates)
Major Project Milestones
Follow our journey as we progress through the key milestones of the project:
|
No 358_29a4ad-15> |
Milestone 358_993bc0-28> |
Work Package 358_b9e1df-5f> |
Completed? 358_aef2e4-f2> |
|---|---|---|---|
|
1 358_194a4b-f7> | 358_5760c5-d0> |
Surveyor pegging, services disconnect, demolition permit, demolition, rubble removal and earthworks 358_9a50cc-93> | 358_58920f-aa> |
|
2 358_9d93e2-97> | 358_06948d-13> |
Concept design, council liaison, preliminary engineering reports, DA design, Development Application submitted and approved 358_d88cae-61> | 358_a2de18-b3> |
|
3 358_199858-04> | 358_a2ecbb-bc> |
Working drawings, final engineering reports, landscape plan, building permit application and building permit issued 358_479f76-d5> | 358_103471-07> |
|
4 358_269789-16> | 358_2c0aed-99> |
Surveyor pegging, earthworks, drainage, pre-lays, steelwork, formwork, termite treatment, pouring the footings & slab 358_c08014-f3> | 358_3d2173-84> |
|
5 358_e9298d-ec> | 358_48c90b-cd> |
Brickwork, bricking in door and window frames on ground floor 358_0d5379-dd> | 358_2d6b64-e9> |
|
6 358_6ea5a3-ab> | 358_82e9c0-5c> |
Pre-lays, steelwork, formwork, pouring the columns and suspended slab 358_5b5f39-08> | 358_2729c6-b0> |
|
7 358_d32c2d-0d> | 358_4fd94a-fb> |
WIP: Scaffolding, brickwork, first floor external rendering/painting 358_221f26-cc> | 358_1fec66-99> |
|
8 358_63caf0-bf> | 358_9e73e7-ef> |
Roof framing, roof sheeting, ducts and tubes, flashings and gutters, insulation 358_625250-8d> | 358_ac3bd3-9e> |
|
9 358_0d478f-38> | 358_8ec06e-41> |
External & internal plastering, glazing, hanging external doors, ceilings and insulation 358_8e3e0e-17> | 358_158b5e-87> |
|
10 358_8519ec-e4> | 358_622399-8a> |
Hanging internal doors, cabinetry, benchtops, carpets and tiles, wet areas, blinds, electrical fittings, aircon, security, internal painting 358_973a4c-92> | 358_c56670-df> |
|
11 358_c0d201-24> |
Ground Floor Lockup 358_e377a4-8b> |
Ground floor roof framing and sheeting, tubes and ducts, internal plastering, glazing, hanging external doors, ceilings and insulation 358_9b3801-86> | 358_6b45aa-18> |
|
12 358_684082-49> |
Ground Floor Fit-out 358_209a0d-13> |
Hanging internal doors, cabinetry, benchtops, carpets and tiles, wet areas, blinds, electrical fittings, aircon, security, internal painting 358_8f52e3-bd> | 358_096f84-47> |
|
13 358_39864c-3f> |
External Hardscaping 358_a49527-63> |
Boundary walls, fencing, retic pre-lays, paving, reticulation installation, parking bays, ground floor external rendering/painting 358_8993c8-be> | 358_ef477f-cc> |
|
14 358_5f1528-ce> |
Soft Landscaping 358_e85a41-89> |
Soil and fertilizer, planting, cleanup 358_2fbe09-bc> | 358_a54186-cc> |
|
15 358_5b31c5-13> |
Project Completion & Handover 358_75e130-3c> |
Final site cleanup, all work completed, final inspection and handover 358_ba6269-99> | 358_1bbf93-73> |